THE PLAN — IN ONE PARAGRAPH

Submit claims in two smaller batches a day instead of one large batch, so errors are found the same day they are made — lifting the gauge from 73.5% toward 80.0% by Friday, December 11, 2026, without adding hours.

Why this plan: the sample week’s records point the same way. The Commitment Page’s most frequent miss was waiting on clinic information, the Near-Miss Log shows most catches happening late in the day, and the WIP Board’s flow time is 2.0 days. Smaller, earlier batches attack all three at once.

GATE 1

Baseline Agreed

HOLDER · DANA — TEAM LEAD

Entry evidence: the Gauge Sheet for October 12–16, 2026, signed as the starting point — gauge 73.5%, rolled yield 80.0%.

PASSED · OCT 19, 2026

GATE 2

Pilot Designed

HOLDER · ELENA — SUBMISSIONS

Entry evidence: a one-page pilot design — two batches a day (noon and 3:30 p.m.) for two weeks, on two clinic queues, with the old way kept for the rest.

PASSED · OCT 23, 2026

GATE 3

Results Verified

HOLDER · JUNE — VERIFICATION

Entry evidence: June’s independent recount of the pilot’s two weeks — gauge, rolled yield, and PPC for pilot queues against the rest, from the source counts.

IN PROGRESS · DUE NOV 20, 2026

GATE 4

Made Standard

HOLDER · MARCUS — CODING REVIEW

Entry evidence: the updated standard-work sheet for submission, written and posted at the board, with Priya and Tom briefed on the two-batch rhythm.

NOT YET ENTERED

How a gate works: a gate is passed only when its holder has seen the entry evidence with their own eyes and signed the plan. Work for the next stage may be prepared early, but it does not count as begun until the gate before it has passed. Two gates passed, one in progress, one waiting — that is an honest picture of where this plan stands today.